Annex one – Requirements for Close-Up Survey at Renewal Surveys of Double-Side Skin Bulk Carriers
.closeup inspection
.esp 10
Close-up inspection: 10-15 years of age (renewal survey no-3)
1. Ballast tank:
– all transverse webs, their plating and longitudinals (short form of longitudinal stiffeners)
– all transverse bulkheads their stiffening system
2. Double side tank:
– on side shell(outer) and inner side plating (forward, middle, and aft parts)
– 25% of ordinary transverse frame (in transverse framing system)
or
– 25% of longitudinal framing (longitudinal framing system)
3. Cargo hold:
– transverse bulkheads including internal structure of upper and lower stools (triangular shape), where fitted.
4. Hatch cover and coaming:
– all cargo hold hatch cover and coamings (their plating and stiffeners)
5. Deck plating and underside of deck structure:
– all deck plating and under deck structure inside line of hatch opening between all cargo hold hatches
.esp 15